
Featured Sidewalk and Entrance Project
140 Broadway
Lower Manhattan
Project overview
At 140 Broadway, Jepol Construction delivered a coordinated street-level improvement program encompassing the entrance, accessibility ramp, sidewalk, and supporting construction below grade.
Work was sequenced along an active Manhattan sidewalk and around the building's existing columns and storefront conditions. The finished project creates a cleaner, more accessible approach while documenting the structural preparation behind the visible concrete work.
- Location
- Lower Manhattan
- Property
- Commercial building
- Services
- Accessible entrance
- Sidewalk replacement
- Concrete work
- Structural support
Project scope
Entrance and accessibility
The completed entrance incorporates a clear ramp, stairs, and railings within the existing storefront rhythm. The work improves access while maintaining a compact footprint along the busy sidewalk.



Project scope
Sidewalk replacement
New concrete was installed along the facade and carefully finished around columns, thresholds, and adjoining pavement. Process and completion views show the work progressing through an active streetscape.



Project scope
Preparation below the surface
Before the finished pavement was placed, the team addressed reinforcement and supporting conditions below the entrance and sidewalk. These views reveal the construction that makes the visible work durable.



Additional perspectives
Project gallery


